Site prep & pad work
Grading, compacting, and preparing the pad so the home sits on stable, level ground. The single most important step in how the home performs for the next 30 years.
From an empty lot to a finished, lived-in home — site prep, set, level, anchor, hook up the utilities, skirt, and sign off the final inspection. One C-47 licensed installer for the whole package, with 800+ new homes set from the factory across 25+ years.
A new home install is more than dropping the home on the lot. It's a string of jobs that have to be done in the right order, by people who have done it many times before. We handle every step.
Grading, compacting, and preparing the pad so the home sits on stable, level ground. The single most important step in how the home performs for the next 30 years.
Receiving the home from the transport, positioning it on the lot, and joining sections on multi-wide homes.
Setting every pier and support to the correct height so the home sits true. The same job we do on releveling — done right the first time.
Tie-down anchors and certified earthquake resistant bracing (ETS 107-G) installed per California requirements.
Water, sewer, gas, and electrical connections to the home — done correctly the first time so they pass inspection without callbacks.
Skirting installation around the perimeter and any other finish work needed before the home is ready to live in.
We coordinate with HCD and the local agency for the final inspection, so the paperwork lands where it needs to without you chasing it down.
For buyers using FHA, VA, or conventional financing, we install permanent engineered foundations including 433A — meets lender and county requirements.
You bought a new mobile or manufactured home and you need someone to set it on your lot. We handle the entire install, coordinate with your dealer, and hand you a finished home.
California mobile and manufactured home dealers use us as their installer of record across Central California. We hit dates, we don't bounce back to your office with problems, and our paperwork is clean.
Mobilehome park operators bringing new homes onto vacant lots — we'll prep the site, set the home, and sign it off so you can fill the lot.
We come out to the lot, look at access, soil, utilities, and what's needed to get the home in. You get an itemized quote covering everything from pad to final inspection.
Pad work, grading, and any preliminary utility runs handled before the home arrives. By the time the transport pulls up, the lot is ready.
Home gets set on the lot, leveled on piers, anchored or seismically braced, and connected to utilities. Single-wides 2-3 days; double-wides 4-7 days.
Final inspection coordinated with HCD or the local agency. We hand you a finished home, complete paperwork, and a property ready to live in.
Owner Clinton Dotson has personally installed more than 800 new mobile and manufactured homes from the factory across 25+ years in the business. That is the experience installing a home requires — the kind that catches a problem on the pad before the home arrives, the kind that recognizes a bad utility connection before it becomes a callback.
We install for individual buyers, for California mobile home dealers, and for mobilehome parks across Central California. The work passes inspection the first time and the homes sit right for decades.
Request a Free QuoteWe install new mobile and manufactured homes in seven Central California counties, including the following cities and the surrounding areas:
Counties served: Kern County, Kings County, Tulare County, Fresno County, Ventura County, Santa Barbara County, San Luis Obispo County. Call (661) 339-8050 if you are nearby and not sure.
A complete new home install covers everything from the empty lot to a finished, lived-in home: site prep and pad work, setting the home from the factory transport, leveling, pier supports, anchoring or seismic bracing, hooking up water, sewer, gas, and electrical, skirting, and the final inspection to sign the home off. We handle the whole package under one C-47 license.
Yes. We routinely install homes purchased through California mobile and manufactured home dealers, and we work directly with mobilehome park operators who need a new home set on a lot. Park operators and dealers across Central California know our work and our paperwork.
From the day the home arrives on the lot, a standard single-wide is usually 2-3 days. A double-wide or triple-wide is 4-7 days. Site prep before the home arrives is a separate timeline depending on what the lot needs.
New home installation pricing varies more than any other service we offer — it depends on the size of the home, the condition of the lot, what utility connections are needed, and whether you want a permanent foundation or pier-and-anchor. Call (661) 339-8050 for an accurate quote.
Yes. We install permanent engineered foundations including 433A foundations — required for FHA, VA, and most conventional financing on manufactured homes. Pricing for permanent foundation systems starts at $6,500.
Yes. We coordinate with HCD and the local agency that signs the home off after installation, so the final inspection paperwork lands where it needs to. You don't chase agencies — we do.
Central California — Kern, Kings, Tulare, Fresno, Ventura, Santa Barbara, and San Luis Obispo counties. That includes Bakersfield, Hanford, Visalia, Fresno, Ventura, Oxnard, Santa Maria, San Luis Obispo, Pismo Beach, Paso Robles, and the surrounding areas. Call (661) 339-8050 if you are nearby and not sure.
Tell us about the home and the lot and we'll get back to you to schedule. Choose New Home Installation in the form below.